Surabaya City Government Accelerates Pump House Construction Ahead of Rainy Season
The Surabaya City Government is accelerating infrastructure improvements to prepare for the upcoming rainy season. The city government coordinates these efforts with the East Java Provincial Government, BBWS, and PJT I. The government accelerates the construction of pump houses, increases channel capacity, and gradually normalizes rivers. The city government prioritizes flood-prone areas for these infrastructure improvements to mitigate potential flooding risks during heavy rainfall periods.
River System Limitations
Surabaya Mayor Eri Cahyadi stated that most Surabaya rivers are irrigation channels, not designed for large flood volumes. Mayor Eri Cahyadi explained that the city government is building pump houses because the rivers are irrigation channels. The city government is also performing maintenance and widening channels to improve water flow across the metropolitan area. These actions aim to enhance the overall hydraulic capacity of the existing river network to manage increased water volumes effectively during the rainy season.
Pump House Construction Progress
The city government is building five new pump houses across several districts. These five new pump houses are located in Nginden Intan Selatan, Panjang Jiwo, Tambak Segaran, Dharmahusada, and Tanjungsari. The construction of these five pump houses is over 85% complete as of the latest reports. The five pump houses are scheduled for commissioning on November 20, 2026, to become operational before the peak rainy season arrives.
Integrated Pumping System Development
The city government is building an integrated pumping system for Semolowaru, Nginden Intan, and Manyar. This integrated pumping system utilizes a shortcut to Kali Jagir, a water gate located in the Semolowaru channel. The system also incorporates a box culvert crossing the Bethany Nginden Church property to optimize water conveyance. The total pumping capacity in Nginden Intan Selatan is planned to reach 23 cubic meters per second once the integrated system becomes fully operational.
The city government is building, repairing, and widening channels to prevent flooding across the city. These ongoing infrastructure projects represent a significant investment in urban water management infrastructure. The coordination between the Surabaya City Government, the East Java Provincial Government, BBWS, and PJT I ensures a comprehensive approach to flood mitigation. These coordinated efforts aim to ensure that the city infrastructure can handle the increased water volumes associated with the rainy season effectively.
Glossary
- BBWS — BBWS is mentioned in relation to the East Java Provincial Government. It is part of the coordination efforts for infrastructure improvements. These efforts are aimed at preparing for the upcoming rainy season.
- Tanjungsari — Tanjungsari is a location where one of the five new pump houses is located. The construction of this pump house is over 85% complete. It is scheduled to become operational before the peak rainy season arrives.
- Manyar — Manyar is a location where an integrated pumping system is being built. This system utilizes a shortcut to Kali Jagir. The system is designed to optimize water conveyance.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0